Project Scheduler

Ashville, OH
Full Time
Experienced
Title: Project Scheduler
Location: Ashville, OH
Division: Enerfab Power & Industrial
Reports to: Project Controls Manager
Salary Range: $80,000 to $130,000

Company Summary:
Enerfab has over 125 years of experience, offering fabrication and construction capabilities to a wide variety of customers for the chemical, food & beverage, oil & gas, heavy industrial and power industries. Founded in 1901, our company began making sealants and lacquers — including a patented formula for brewer’s pitch — for beer tanks and vessels. Over the last century, our expanded capabilities, project experience, safety record, and commitment to quality have made Enerfab one of the industry leaders in shop fabrication, field erection and construction and maintenance services.

The Project Scheduler plays a critical role in supporting the successful execution of complex construction projects by managing project controls tools and processes that drive cost, schedule, and resource accountability. This entry-level position will provide hands-on experience in industrial project planning, cost forecasting, earned value management, and change control—skills that are highly valued in the heavy industrial and power sectors.

Key Responsibilities:
Project Planning and Scheduling:
• Develop and maintain Primavera P6 schedules for field-based capital and maintenance projects, including turnarounds, shutdowns, and outages.
• Build and maintain Work Breakdown Structures (WBS) and Activity Codes to support schedule reporting by craft, system, or scope.
• Assist in resource loading by discipline, shift, and subcontractor to support manpower planning and resource leveling.
• Support critical path method (CPM) scheduling techniques to identify key dependencies and project drivers.

Cost Management & Forecasting:
• Support the development and maintenance of project cost reports, including committed costs, actuals, earned value, and remaining forecasts.
• Track field labor hours by craft and compare against budgeted labor curves and productivity goals.
• Coordinate with procurement to track equipment, materials, and subcontractor commitments and integrate them into forecast reports.
• Participate in the preparation of monthly project cost forecasts and risk-adjusted contingency plans.

Earned Value & Performance Tracking:
• Assist in calculating and reporting on earned value metrics such as CPI (Cost Performance Index), SPI (Schedule Performance Index), and percent complete.
• Compare planned vs. actual progress and prepare variance analyses with supporting narratives.
• Track field installation quantities (e.g., weld inches, linear feet, equipment sets) against budgeted targets.

Change Management & Risk Mitigation:
• Log and track all project changes, including scope modifications, delays, and field conditions, ensuring proper documentation and approvals.
• Analyze change impacts on cost and schedule and support the update of baseline forecasts accordingly.
• Participate in risk reviews and support the development of mitigation strategies, including schedule acceleration or resequencing.

Controls Integration in Industrial Environments:
• Integrate cost, schedule, and scope control through coordination with field superintendents, safety, QA/QC, procurement, and engineering.
• Understand the unique challenges of industrial construction, including confined work windows, multiple concurrent crews, and safety-critical execution.
• Work closely with planners, estimators, and field teams to update schedules with field progress data and constraints.

Reporting and Communication:
• Generate weekly and monthly project performance reports, including man-hour trends, cost and schedule variances, and executive dashboards.
• Support field progress tracking meetings and collaborate with superintendents and project managers to validate earned progress.
• Communicate status updates and key metrics to internal leadership and client representatives.

Document Control and Data Management:
• Maintain organized digital files of schedules, reports, change logs, and supporting documentation.
• Ensure adherence to project controls procedures and support audits as required.

Qualifications:
• Bachelor’s degree in Construction Management, Engineering, Industrial Technology, or a related field.
• 4-8 years of experience in project controls, scheduling, cost engineering, or field project support in an industrial or heavy construction environment.
• Proficiency in Primavera P6 is required. Familiarity with cost control software, Power BI, or ERP systems (e.g., SAP) is a plus.
• Excellent Excel skills, including formulas, pivot tables, and data visualization.
• Strong analytical thinking and attention to detail in high-pressure environments.
• Effective communicator, both written and verbal, with an ability to present complex information clearly.
• Valid driver’s license; travel to field sites is required.
 
Share

Apply for this position

Required*
We've received your resume. Click here to update it.
Attach resume as .pdf, .doc, .docx, .odt, .txt, or .rtf (limit 5MB) or Paste resume

Paste your resume here or Attach resume file

To comply with government Equal Employment Opportunity and/or Affirmative Action reporting regulations, we are requesting (but NOT requiring) that you enter this personal data. This information will not be used in connection with any employment decisions, and will be used solely as permitted by state and federal law. Your voluntary cooperation would be appreciated. Learn more.

Invitation for Job Applicants to Self-Identify as a U.S. Veteran
  • A “disabled veteran” is one of the following:
    • a veteran of the U.S. military, ground, naval or air service who is entitled to compensation (or who but for the receipt of military retired pay would be entitled to compensation) under laws administered by the Secretary of Veterans Affairs; or
    • a person who was discharged or released from active duty because of a service-connected disability.
  • A “recently separated veteran” means any veteran during the three-year period beginning on the date of such veteran's discharge or release from active duty in the U.S. military, ground, naval, or air service.
  • An “active duty wartime or campaign badge veteran” means a veteran who served on active duty in the U.S. military, ground, naval or air service during a war, or in a campaign or expedition for which a campaign badge has been authorized under the laws administered by the Department of Defense.
  • An “Armed forces service medal veteran” means a veteran who, while serving on active duty in the U.S. military, ground, naval or air service, participated in a United States military operation for which an Armed Forces service medal was awarded pursuant to Executive Order 12985.
Veteran status



Voluntary Self-Identification of Disability
Voluntary Self-Identification of Disability Form CC-305
OMB Control Number 1250-0005
Expires 07/31/2029
Why are you being asked to complete this form?

We are a federal contractor or subcontractor. The law requires us to provide equal employment opportunity to qualified people with disabilities. We have a goal of having at least 7% of our workers as people with disabilities. The law says we must measure our progress towards this goal. To do this, we must ask applicants and employees if they have a disability or have ever had one. People can become disabled, so we need to ask this question at least every five years.

Completing this form is voluntary, and we hope that you will choose to do so. Your answer is confidential. No one who makes hiring decisions will see it. Your decision to complete the form and your answer will not harm you in any way. If you want to learn more about the law or this form, visit the U.S. Department of Labor’s Office of Federal Contract Compliance Programs (OFCCP) website at www.dol.gov/ofccp.

How do you know if you have a disability?

A disability is a condition that substantially limits one or more of your “major life activities.” If you have or have ever had such a condition, you are a person with a disability. Disabilities include, but are not limited to:

  • Alcohol or other substance use disorder (not currently using drugs illegally)
  • Autoimmune disorder, for example, lupus, fibromyalgia, rheumatoid arthritis, HIV/AIDS
  • Blind or low vision
  • Cancer (past or present)
  • Cardiovascular or heart disease
  • Celiac disease
  • Cerebral palsy
  • Deaf or serious difficulty hearing
  • Diabetes
  • Disfigurement, for example, disfigurement caused by burns, wounds, accidents, or congenital disorders
  • Epilepsy or other seizure disorder
  • Gastrointestinal disorders, for example, Crohn's Disease, irritable bowel syndrome
  • Intellectual or developmental disability
  • Mental health conditions, for example, depression, bipolar disorder, anxiety disorder, schizophrenia, PTSD
  • Missing limbs or partially missing limbs
  • Mobility impairment, benefiting from the use of a wheelchair, scooter, walker, leg brace(s) and/or other supports
  • Nervous system condition, for example, migraine headaches, Parkinson’s disease, multiple sclerosis (MS)
  • Neurodivergence, for example, attention-deficit/hyperactivity disorder (ADHD), autism spectrum disorder, dyslexia, dyspraxia, other learning disabilities
  • Partial or complete paralysis (any cause)
  • Pulmonary or respiratory conditions, for example, tuberculosis, asthma, emphysema
  • Short stature (dwarfism)
  • Traumatic brain injury
Please check one of the boxes below:

PUBLIC BURDEN STATEMENT: According to the Paperwork Reduction Act of 1995 no persons are required to respond to a collection of information unless such collection displays a valid OMB control number. This survey should take about 5 minutes to complete.

You must enter your name and date